[What preparations need to be done before cooling tower operation?]
Release date:[2020/7/21] Is reading[569]次

What preparations need to be done before cooling tower operation?


The cooling tower needs to do these preparations before operation:


Before the cooling tower is in operation, two preliminary works should be carried out, namely inspection and cleaning. The operation part should be inspected in detail and can only be carried out after there is no problem. The following are the aspects to be checked:


1. Enter the cooling tower through the inspection door, clean up the debris and silt on the water collection tank, and check whether the pipeline is blocked.

2. Use high-pressure water (the water pressure should not be too high) to wash the soil in the water collector and sump, and discharge the sewage through the drain.

3. Check whether the motor wiring is correct and reliable. Whether the motor junction box is tightly closed to prevent moisture infiltration.

4. Check the belt tightness a in the belt drive to make it between 8~15mm.

5. Check whether the fan rotates flexibly and smoothly, and whether the gap between the tail of each fan blade and the water tower shell is even.

6. Check if the float valve assembly is installed properly.

7. Check whether the number and density of each layer of film are appropriate.

8. Check whether all bolts of the cooling tower have been tightened.


In order to make your cooling tower perform better and prolong its service life, a good inspection is essential.


Jiangsu Jincheng Air Conditioning Engineering Co., Ltd. has been focusing on the design, development and production of industrial air conditioning equipment for many years. Its industrial refrigeration is widely used. The main products are: industrial air conditioning, chemical fiber industrial air conditioning, textile industrial air conditioning, chemical fiber industrial refrigeration, and dust-free workshop refrigeration , Ventilation ducts, cooling towers, refrigerators and other air conditioning units and accessories.


Jiangsu Jincheng is a rare conscience manufacturer in the industrial refrigeration industry. If you want to know more product information, please contact: Mr. Song 13705113637 Website: http://www.z7611.cn/


Keyword:
ADD:No. 18, Rongguang Road, National High-tech Park, Yancheng City, Jiangsu Province Phone: 0086-13705113637 Tell: 0086-0515-88809180 Fax: 0086-0515-88809181 E-Mail: jsjckt@126.com
Copyright ? 2018 All rights reserved
Copyright Jiangsu Jin Cheng Air Conditioning Engineering Co.,Ltd 技術支持:中國丙綸網